Pipeline Construction Update: Lake Oswego

42” steel pipe arriving on Chandler Road

42” steel pipe arriving on Chandler Road

This update includes construction work in the following areas. Scroll down for specific information on each location:

  • Lanewood Street
  • Douglas Circle
  • Twin Fir Road
  • Upper Drive
  • Chandler Road
  • Iron Mountain Boulevard
  • B Ave

For the most up to date information on construction and road closures, please visit work underway, call the hotline on 503-697-6502 or email lotwater@ci.oswego.or.us

Lanewood Street – pipeline construction almost complete!

Crews have installed roughly 1,000 feet of pipe along Lanewood, and should be complete mid next week. Traffic detours are in place around Lanewood Street, between Boones Ferry Road and Douglas Circle. The road is closed during workhours (7 a.m. to 6 p.m., Monday through Friday), but will reopen after work is complete. Access is allowed for local residents and emergency vehicles within the closed area. For more information about construction and road closures, visit the work underway page.

Douglas Circle – pipeline construction starting next week!

This week, crews surveyed and saw-cut the asphalt in preparation for pipe installation. Crews will begin installing pipe along the southerly leg of Douglas Circle, from mid next week. This work is expected to take about three weeks to complete. Traffic detours will be in place around Douglas Circle, between Twin Fir Road and Lanewood Street. The road will be closed during work hours (7 a.m. to 6 p.m., Monday through Friday). Access will be allowed for local residents and emergency vehicles within the closed area. For more information about construction and road closures, visit the work underway page.

Twin Fir Road – pipeline construction starting in mid April

Crews will install pipeline along Twin Fir Road, then onto a portion of Upper Drive after work is complete along Douglas Circle. This is expected to begin in mid April and take about two weeks to complete. During the work, traffic detours will be in place around Twin Fir Road.

Upper Drive – pipeline construction starting in early – mid May

Once work is complete on Twin Fir Road, crews will install pipe in a portion of Upper Drive. This is expected to begin in early May.

Chandler Road – pipeline construction underway

This week, crews started installing 42” pipeline along Chandler Road, working towards Iron Mountain Blvd. Work on Chandler Road is expected to be complete in early April. Work hours are 7 a.m. to 6 p.m. Monday to Friday. During this time, there is a single lane closure on Chandler Road. Please watch for flaggers and expect some temporary delays. For more information about construction and road closures, visit the work underway page.

Iron Mountain Boulevard – pipeline construction starting in early – mid April

Crews will start progressing west on Iron Mountain Boulevard, after work is complete on Chandler Road. This is expected to begin in early-mid April.

B Ave – exploratory digging and geologic investigations in April

Throughout April, crews will be working between 7 a.m. – 4:00 p.m. along the proposed water pipeline route on 10th Street to A Ave., A Ave. to 9th Street, 9th Street between A and B Ave., and B Ave. between 9th and State Street. Crews will dig small holes in the roadway to locate all underground utilities and pipes, to ensure the pipeline route does not conflict with existing utilities. Once this work is complete, exploratory drilling will take place along these streets to investigate geological conditions.

We apologize for the inconvenience this work may cause and thank you for your patience as construction progresses.